Jimbe is developing a phased copper processing operation based initially on the recovery of copper from existing tailings — above-ground copper-bearing material that has already been mined and processed historically.
Jimbe's initial development strategy is focused on recovering copper from existing tailings rather than relying solely on conventional primary mining.
Based on current planning assumptions, more than 35 million tonnes of tailings contain an average assumed copper content of approximately 0.80% Cu. This corresponds to approximately 280,000 tonnes of contained copper before recovery losses.
The actual recoverable quantity will depend on mineralogy, sampling, metallurgical testwork, process performance and continued verification of the tailings. Using a 40% recovery assumption as a conservative lowest-case planning case gives approximately 112,000 tonnes of recoverable copper.
These figures are indicative planning calculations and are not a Mineral Resource or Mineral Reserve classification.
Jimbe Plant → Copper Concentrate → Downstream Copper Production is the development pathway.
At an indicative concentrate grade of 18%–25% Cu, producing approximately 7,200 tonnes of recovered copper per year would correspond to approximately 28,800–40,000 tonnes of copper concentrate per year.
Indicative calculation based on concentrate grade range; final concentrate specification is subject to metallurgical testwork.
Copper concentrate produced by the Jimbe processing operation is intended for downstream copper production. The current development target is approximately 600 tonnes of copper per month, equivalent to approximately 7,200 tonnes per year at steady state.
Downstream production remains subject to final engineering, metallurgical performance, financing, construction, commissioning and operating validation.
Jimbe has offtake arrangements in place for its production, providing an established commercial pathway for copper produced through the project.
This supports the development strategy from recovered material through concentrate production and onward to downstream copper production.
Jimbe Minerals has secured exclusive access to qualifying copper-bearing material from the Mushishima Tailings as the initial feedstock base for its Phase 1 processing operation, subject to applicable contractual, technical, environmental and regulatory requirements.
More than 35 million tonnes of indicative tailings material are covered by the feedstock arrangement, subject to continued verification, sampling, assay and technical assessment.
{{ s.body }}
Process design must reflect the characteristics of the qualifying copper-bearing feedstock, as established by sampling, assay and metallurgical testwork.
Development must proceed within applicable environmental and regulatory requirements.
Plant development must be based on practical operating and logistics requirements.
The Company's mineral assets can progressively support the longer-term development pathway as they advance.
As the Company's mineral assets progress through technical evaluation and development, the processing platform can provide a pathway toward greater integration between secured feedstock, mining and copper processing.
Verification is an ongoing process. Jimbe will continue sampling, assay, mineralogical assessment and metallurgical testwork as the tailings are progressively evaluated and processed. Final recovery performance, process configuration and production parameters will be refined as additional technical evidence becomes available.
Phase 1 is in development. Production has not commenced.
For technical, partnership, offtake or corporate enquiries regarding the processing development, contact the Company.