Copper Processing Plant | Jimbe Minerals Zambia
Mushishima copper-bearing tailings and mining environment, Zambia
Phase 1 — In Development

Recovering copper from existing tailings

Jimbe Minerals is developing a phased copper processing operation focused initially on the recovery of copper from existing tailings in Zambia's Copperbelt.

The project is designed around a modular approach, allowing processing capacity and technical parameters to be refined as sampling, assay work and metallurgical testwork progress. The initial objective is to produce a saleable copper concentrate for downstream copper production.

Status: Phase 1 — In Development · Production has not commenced
{{ k.pre }}
{{ k.v }}
{{ k.unit }}
{{ k.k }}
{{ k.note }}
0.50% Cu is the lowest accepted feed-grade threshold used when evaluating qualifying material; it is not the average grade. Exclusive access has an initial 12-month period, renewable for five years or more, subject to performance and the applicable agreement.
Figures are indicative management planning assumptions, subject to continued verification, metallurgical testwork and engineering validation. They are not a Mineral Resource or Mineral Reserve estimate.
Phase 1 — In Development

Phase 1 · Copper Recovery & Concentrate Production

Jimbe is developing a phased copper processing operation based initially on the recovery of copper from existing tailings — above-ground copper-bearing material that has already been mined and processed historically.

Copper Inventory

A large above-ground copper inventory

Jimbe's initial development strategy is focused on recovering copper from existing tailings rather than relying solely on conventional primary mining.

Based on current planning assumptions, more than 35 million tonnes of tailings contain an average assumed copper content of approximately 0.80% Cu. This corresponds to approximately 280,000 tonnes of contained copper before recovery losses.

The actual recoverable quantity will depend on mineralogy, sampling, metallurgical testwork, process performance and continued verification of the tailings. Using a 40% recovery assumption as a conservative lowest-case planning case gives approximately 112,000 tonnes of recoverable copper.

These figures are indicative planning calculations and are not a Mineral Resource or Mineral Reserve classification.

0.50% Cu
Lowest accepted feed-grade threshold
Conservative lower threshold for evaluating qualifying material — not the average grade.
  1. {{ q.label }}
    {{ q.note }}
    {{ q.calc }}
    {{ q.pre }}
    {{ q.v }}
Technical note: Project tonnage, grade, contained copper, recovery and production figures are indicative management planning assumptions. They remain subject to continued sampling and assay, mineralogical characterisation, metallurgical testwork, engineering validation and independent technical assessment. The figures presented do not constitute a Mineral Resource or Mineral Reserve estimate.
Downstream Pathway

From concentrate to copper

Jimbe Plant → Copper Concentrate → Downstream Copper Production is the development pathway.

Indicative concentrate production
28,800–40,000 t/year
Approximately 2,400–3,300 tonnes of concentrate per month

At an indicative concentrate grade of 18%–25% Cu, producing approximately 7,200 tonnes of recovered copper per year would correspond to approximately 28,800–40,000 tonnes of copper concentrate per year.

Indicative calculation based on concentrate grade range; final concentrate specification is subject to metallurgical testwork.

Downstream copper production
600 t/month · 7,200 t/year
Development target at steady state

Copper concentrate produced by the Jimbe processing operation is intended for downstream copper production. The current development target is approximately 600 tonnes of copper per month, equivalent to approximately 7,200 tonnes per year at steady state.

Downstream production remains subject to final engineering, metallurgical performance, financing, construction, commissioning and operating validation.

Commercial pathway
Offtake arrangements in place

Jimbe has offtake arrangements in place for its production, providing an established commercial pathway for copper produced through the project.

This supports the development strategy from recovered material through concentrate production and onward to downstream copper production.

Secured Feedstock

Mushishima — Secured Feedstock

Jimbe Minerals has secured exclusive access to qualifying copper-bearing material from the Mushishima Tailings as the initial feedstock base for its Phase 1 processing operation, subject to applicable contractual, technical, environmental and regulatory requirements.

More than 35 million tonnes of indicative tailings material are covered by the feedstock arrangement, subject to continued verification, sampling, assay and technical assessment.

Secured access does not represent ownership of the entire tailings deposit. The tailings material is not reported as a Mineral Resource or Mineral Reserve. Quantity, grade, recoverability and metallurgical characteristics remain subject to technical verification, sampling, assay and metallurgical testwork.
Mushishima copper-bearing tailings and mining environment, Zambia
Excavation equipment in a copper-bearing tailings and mining environment, Zambia
Aerial view of copper-bearing tailings and surrounding mining landscape, Zambia
Mushishima — copper-bearing tailings and mining environment
Processing Development

Phased Processing Development

{{ s.stage }} {{ s.status }}
{{ s.title }}

{{ s.body }}

Principles

Engineering-Led Development

Technical

Process design must reflect the characteristics of the qualifying copper-bearing feedstock, as established by sampling, assay and metallurgical testwork.

Environmental

Development must proceed within applicable environmental and regulatory requirements.

Operational

Plant development must be based on practical operating and logistics requirements.

Expansion

The Company's mineral assets can progressively support the longer-term development pathway as they advance.

Development Pathway

From Secured Feedstock to Integrated Copper Development

As the Company's mineral assets progress through technical evaluation and development, the processing platform can provide a pathway toward greater integration between secured feedstock, mining and copper processing.

  1. {{ d.num }}{{ d.arrow }}
    {{ d.label }}
    View →
Status

Technical Status

Verification is an ongoing process. Jimbe will continue sampling, assay, mineralogical assessment and metallurgical testwork as the tailings are progressively evaluated and processed. Final recovery performance, process configuration and production parameters will be refined as additional technical evidence becomes available.

Continued verification↓Continued operating data↓Progressively stronger technical confidence

Phase 1 is in development. Production has not commenced.

Completed — work already completed
Ongoing — work currently being undertaken
In Development — Phase 1 work currently progressing
Development Target — production objective, not a result
Pending — dependent on verification, testwork, permitting or agreement
{{ s.item }}
{{ s.note }}
{{ s.status }}
Final process configuration remains subject to mineralogical assessment, metallurgical testwork, engineering validation and applicable permitting requirements.