Investor Centre | Jimbe Minerals
Geologists overlooking a drill site from a rocky outcrop in Zambia
Investor Centre

Supporting Investor Due Diligence

Information on Jimbe Minerals' development strategy, current project position, secured feedstock, processing development and copper project portfolio — presented with the technical qualifications that apply.

Development Strategy

A Phased Copper Development Pathway

Jimbe Minerals Limited is a Copper Project Development Company focused on building long-term copper production assets in Zambia through disciplined exploration, engineering, processing development and phased project execution.

  1. {{ p.n }}{{ p.arrow }}
    {{ p.t }}
Current Project Position

Where Each Asset Stands Today

Status categories: Completed, Ongoing, In Development, Planned, Recommended, Pending. No mineral resource or reserve has been declared under an internationally recognised reporting code unless specifically stated on the relevant project page.

{{ r.asset }}
{{ r.type }}
{{ r.note }}
{{ r.status }}
Secured Feedstock

Mushishima — Secured Feedstock

Jimbe Minerals has secured exclusive access to qualifying copper-bearing material from the Mushishima Tailings as the initial feedstock base for its Phase 1 processing operation, subject to applicable contractual, technical, environmental and regulatory requirements.

The indicative quantity of material covered by the feedstock arrangement is more than 35 million tonnes. Based on current planning assumptions, the tailings carry an average assumed copper content of 0.80% Cu — approximately 280,000 tonnes of contained copper before recovery losses. These figures remain subject to continued verification, sampling, assay and metallurgical testwork.

Secured access does not represent ownership of the entire tailings deposit. The material is not reported as a Mineral Resource or Mineral Reserve.

{{ f.v }}
{{ f.k }}
Processing Development

Jimbe Processing Plant

Jimbe Minerals is developing a phased copper processing operation based initially on the recovery of copper from existing tailings. The Phase 1 process route is: Existing Copper-Bearing Tailings → Jimbe Processing Plant → Feed Preparation → Copper Recovery → Copper Concentrate → Downstream Copper Production.

7,200 t/year
Downstream copper production target
{{ q.pre }}
{{ q.v }}
{{ q.k }}

Commercial pathway. Jimbe has offtake arrangements in place for its production, providing an established commercial pathway from recovered material through concentrate production and onward to downstream copper production.

Phase 1 — In Development; production has not commenced. Figures are indicative management planning assumptions, subject to continued verification, metallurgical testwork and engineering validation, and are not a Mineral Resource or Mineral Reserve estimate.

Processing Plant →
Mineral Portfolio

Five Copper Projects in Zambia

Processing provides the initial development pathway while Jimbe Minerals continues to advance its wider portfolio of copper assets through disciplined exploration, technical work and phased project development.

{{ p.stage }}
{{ p.name }}
{{ p.note }}
View Project →
Development Priorities

Near-Term Priorities

  1. {{ p.n }} {{ p.t }} {{ p.status }}
Technical Work Programme

Programme Components

{{ w.area }}
{{ w.items }}
Funding Requirements

Use of Funds

Funding is required to complete feedstock verification and metallurgical testwork, to advance processing plant engineering, permitting and construction, and to continue technical programmes across the mineral portfolio.

Detailed funding requirements, use of funds and applicable terms are provided to qualifying investors on request, under NDA.

Private Investors

Qualifying private investors may register interest. Any participation is subject to eligibility, applicable law and definitive documentation.

Register Interest →
Institutional & Strategic

Project-level discussions — including joint ventures, programme funding and offtake-linked structures — with data-room access under NDA.

Open a Conversation →
Key Development Risks

Risks Investors Should Consider

Nothing on this website guarantees returns, production, resource growth, processing recovery or project economics.

{{ k.t }}
{{ k.b }}
JMZ Copper Unit

JMZ — Digital Copper Unit

1 JMZ = 1 KG COPPER

The JMZ Copper Unit is a copper-linked unit of value developed by Jimbe Minerals Limited. Each unit is defined by reference to one kilogramme of copper.

JMZ sits alongside, rather than in place of, the Company's core processing and project development activity.

Request JMZ Information →

The JMZ Copper Unit is under development. Its final structure, terms and any entitlement or redemption arrangements will be set out in definitive documentation. Nothing on this page constitutes an offer, solicitation or recommendation to acquire any unit, security or instrument in any jurisdiction, and no return, valuation or outcome is represented or implied.

JMZ Copper Unit — 1 kg copper unit bearing the Jimbe Minerals emblem
Investor Information

Available to qualifying investors on request rather than as unrestricted public downloads.

{{ r.title }}
{{ r.body }}
{{ r.cta }} →
Investor Relations
cmo@jimbeminerals.com
Contact Investor Relations →

This website is for information purposes only and does not constitute an offer, solicitation or recommendation to buy any securities in any jurisdiction. Any participation is subject to eligibility, applicable law and definitive documentation. Mineral exploration and project development involve risk: exploration may not result in a discovery or a mine, processing development may not achieve target performance, and invested capital is at risk. Prospective investors should conduct their own due diligence and obtain independent professional advice.

Frequently Asked Questions

{{ f.q }}
{{ f.a }}